Folder: S.F. Bridges-Golden Gate-Closings.
Newscopy: "The high winds did no damage to the Golden State Bridge. Manager James E. Rickets said. A check of instruments show that its saw and pitch were small compared to the maximum strain it was built to withstand. It was designed, Mr. Rickets said, to take a maximum downward movement of 10.8 feet, and 5.8 feet upward, at the center span; and a maximum side swing of 27.7 feet at the center span..."