"August 1995." "K/J 930524 / AGS 920801"--Preliminary leaf Includes bibliographical references Executive summary -- 1. Potable, groundwater and reclaimed water systems -- 2. Combined sewer/drainage systems -- 3. Electrical system and communication conduit -- 4. Natural gas system -- Appendices. A. Negative declaration for San Francisco Zoo infrastructure replacement -- B. Zoo water resource feasibility analysis and well destruction issues -- C. Infrastructure geotechnical study No copyright page found. Some text lost due to tight binding.